Publikationer
Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
A bi-level optimization model for project scheduling and traffic flow routing in railway networks
Statens väg- och transportforskningsinstitut, Samhälle, miljö och transporter, SAMT, Trafikanalys och logistik, TAL.ORCID-id: 0000-0002-1643-6365
Statens väg- och transportforskningsinstitut, Samhälle, miljö och transporter, SAMT, Trafikanalys och logistik, TAL.ORCID-id: 0009-0008-8534-4609
RISE Research Institutes of Sweden AB, Sweden.ORCID-id: 0000-0002-0236-783X
2025 (Engelska)Ingår i: Transportation Research Part B: Methodological, ISSN 0191-2615, E-ISSN 1879-2367, Vol. 196, artikel-id 103213Artikel i tidskrift (Refereegranskat) Published
Abstract [en]

Long-term tactical infrastructure planning for a transportation network consists of deciding on renewals and major maintenance works. Such projects constitute large budget volumes and will impair the available traffic capacity during their execution, especially for railway systems. Quantitative methods that schedule and coordinate infrastructure projects together with traffic flow adaptations is however largely lacking today.

This paper addresses the joint planning of temporary capacity restrictions and traffic flow adaptions during track work closures, by proposing a bi-level optimization model which separates the problem into project scheduling (upper level) and traffic assignment (lower level). The latter model uses a novel traffic flow formulation for routing volumes of trains through the transportation network under the capacity restrictions given by the project scheduling. An aggregated network is used together with time discretized into uniform periods, which makes it possible to treat large national planning problems with a planning horizon of up to a year and a period length of a couple hours. The computational properties are evaluated, both for the individual models, and for their joint usage. Furthermore, results from applying the models on two case studies, concerning Northern and South-Western Sweden, are presented.

The main conclusion is that the model formulations are capable of solving realistic planning cases and to provide support for capacity planners at an infrastructure manager, even for a large national railway. The results show that a good overview over the collective traffic impact is obtained, but also that details of particular traffic relations or capacity usage over individual network links and their variation over time can be studied. One major deficiency has been identified in the flow-based traffic assignment model, which can lead to incoherent train flows over long traveling distances and many time periods.

Ort, förlag, år, upplaga, sidor
Elsevier, 2025. Vol. 196, artikel-id 103213
Nyckelord [en]
Infrastructure planning, Maintenance scheduling, Railway traffic, Optimization
Nationell ämneskategori
Transportteknik och logistik Beräkningsmatematik
Identifikatorer
URN: urn:nbn:se:vti:diva-21960DOI: 10.1016/j.trb.2025.103213ISI: 001477082600001Scopus ID: 2-s2.0-105002808721OAI: oai:DiVA.org:vti-21960DiVA, id: diva2:1954681
Forskningsfinansiär
Trafikverket, TRV 2021/119827Tillgänglig från: 2025-04-25 Skapad: 2025-04-25 Senast uppdaterad: 2025-09-11Bibliografiskt granskad

Open Access i DiVA

fulltext(5504 kB)119 nedladdningar
Filinformation
Filnamn FULLTEXT01.pdfFilstorlek 5504 kBChecksumma SHA-512
a81fe8272c401f1c8fb773d154300d5555a1a77dd77b8a3a2fccecacfab896532ed2b45f56713430d6e86ce44d589d6c0d710242efe6a479ab4469b814709f55
Typ fulltextMimetyp application/pdf

Övriga länkar

Förlagets fulltextScopus

Person

Lidén, TomasKristofersson, Filip

Sök vidare i DiVA

Av författaren/redaktören
Lidén, TomasKristofersson, FilipAronsson, Martin
Av organisationen
Trafikanalys och logistik, TAL
I samma tidskrift
Transportation Research Part B: Methodological
Transportteknik och logistikBeräkningsmatematik

Sök vidare utanför DiVA

GoogleGoogle Scholar
Totalt: 120 nedladdningar
Antalet nedladdningar är summan av nedladdningar för alla fulltexter. Det kan inkludera t.ex tidigare versioner som nu inte längre är tillgängliga.

doi
urn-nbn

Altmetricpoäng

doi
urn-nbn
Totalt: 626 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf