Publications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Godstågs avvikande hastighet: analys av förekomst, orsaker och konsekvenser
Swedish National Road and Transport Research Institute, Infrastructure, Infrastructure maintenance.ORCID iD: 0000-0001-8715-9767
Swedish National Road and Transport Research Institute, Infrastructure, Infrastructure maintenance.ORCID iD: 0000-0002-5306-2753
2018 (Swedish)Report (Other academic)Alternative title
Abnormal speed of freight trains : analysis of existence, causes and consequences (English)
Abstract [sv]

Det förekommer att godståg, som på sin transportsträcka mellan ankomst- och slutstation, avviker från tidtabellens tider och det finns flera olika anledningar till att detta inträffar. Konsekvensen av inträffade störningar kan exemplifieras med låg punktlighet, generella kapacitetsproblem, omprioriteringar av godståget, försenad leverans till slutkund.

Syftet med projektet var att ta fram en metod för att analysera förekomsten av godståg som avviker från fastställd tidtabell men också orsaken till det. Resultaten som presenteras i rapporten bygger enbart på data från Trafikverkets databas Lupp.

Det har varit svårt att utifrån ett begränsat material (fyra godståg under två år) hitta tydliga effektsamband mellan olika faktorer. Några slutsatser från projektet kan dock vara intressanta att lyfta fram. Punktligheten för de fyra godstågen vid avgång Hallsberg rangerbangård var under 2015 ca 60 procent och ca 50 procent vid ankomst Malmö godsbangård. Inplanerade uppehåll på vissa stationer mellan Hallsberg och Malmö utnyttjas inte alltid. Störningar kopplade till orsakerna ”Infrastruktur” och ”Järnvägsföretag” utgör tillsammans mellan 60 och 70 procent av totala antalet störningar.

Abstract [en]

It happens that freight trains deviate from the times of the timetable on their transport route between arrival and end station and there are several reasons that this happens. Examples of the consequences of disruptions occurring include low punctuality, general capacity problems, reprioritization of the freight train and delayed delivery to the end customer.

The aim of this project was to develop a method for analysing the existence of freight trains that deviate from the set timetable, as well as the reason for it. The results presented in the report are based solely on data from the Swedish Transport Administration’s database Lupp.

From a limited material (four freight trains over two years), it was difficult to find clear cause-and-effect relationships between different factors. However, some conclusions from the project may be interesting to highlight. In 2015, the punctuality of the four freight trains upon departure from the Hallsberg marshalling yard was about 60 percent and about 50 percent upon arrival at the Malmö goods station. Scheduled stops at some stations between Hallsberg and Malmö are not always used. Disruptions linked to the causes “infrastructure" and “railway companies” together account for between 60 percent and 70 percent of the total number of disruptions.

Place, publisher, year, edition, pages
Linköping: Statens väg- och transportforskningsinstitut, 2018. , p. 58
Series
VTI rapport, ISSN 0347-6030 ; 991
Keywords [en]
Freight train, Rail traffic, Delay, Timetable, Statistical analysis
National Category
Infrastructure Engineering
Research subject
J00 Railway: General works, surveys, comprehensive works, J05 Railway: Freight transport
Identifiers
URN: urn:nbn:se:vti:diva-13463OAI: oai:DiVA.org:vti-13463DiVA, id: diva2:1282675
Available from: 2019-01-25 Created: 2019-01-25 Last updated: 2020-09-11Bibliographically approved

Open Access in DiVA

fulltext(8896 kB)212 downloads
File information
File name FULLTEXT02.pdfFile size 8896 kBChecksum SHA-512
7d4e6837f4d42058e9bd1af0585d72a8fcc18acf3c5300dd1e6fd7736121cad78730aec4c4ac1470e0534418a9b432921bf119fd4d81f5c250e473257ae744a3
Type fulltextMimetype application/pdf

Authority records

Hedström, RagnarEriksson, Olle

Search in DiVA

By author/editor
Hedström, RagnarEriksson, Olle
By organisation
Infrastructure maintenance
Infrastructure Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 383 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 263 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf